Lake Elsinore Cedar Ridge RoofingGet matched with vetted Lake Elsinore roofers in minutes.Get my price

Guide

Signs your roof is finished

A roof that needs replacing usually shows four or five separate small symptoms before it shows one large one.

Guide7 sections1 min readLake Elsinore, CA

Get it looked at

Three questions, and up to three Lake Elsinore contractors. Free either way.

Free · Takes about a minute

Get it looked at

Three questions, and up to three Lake Elsinore contractors. Free either way.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

No cost to you. Contractors pay us, you do not.

The age on the paperwork

If the roof is over twenty years old and made of asphalt, an inspection is worth doing whether or not it is leaking. The failure modes above are much cheaper to catch before the water arrives than after.

Daylight or damp in the attic

Go up on a bright day with the lights off. Pinpoints of daylight through the deck, dark staining on the sheathing, damp insulation or rust running down a nail shank all say water is getting in and has been for a while.

Shingles that curl, cup or go brittle

A roof near the end goes hard. Shingles that were pliable enough to seal down in the sun no longer bond, and the first serious wind takes them.

Sagging along a line

A ridge or a plane that dips is a structural signal rather than a covering one. It usually means decking that has been wet long enough to lose strength, and occasionally framing. This is the one symptom that should not wait.

Granules in the gutter

Asphalt shingles are protected by a granular surface. When that surface starts washing off in quantity, the mat underneath is exposed to ultraviolet and the clock speeds up sharply. A handful of granules after a new roof is normal shedding. Cupfuls, years later, is not.

Repeated repairs in different places

When the leaks stop clustering and start appearing anywhere, you are not fixing a fault any more. You are paying for a replacement in instalments, at a worse rate.

In short

None of these on their own settles it. Two together usually do. An inspection costs little and removes the guesswork entirely.

Related questions

What if the decking is rotten underneath?

Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.

How much deposit is normal?

A third at most, and never the full amount. Pay the balance when the job is finished and you have walked it. Some states cap the deposit by law.

How many contractors will contact me?

Up to three. That is a hard cap, not a guideline. Three is enough to compare and few enough that your phone stays usable.

What is it going to cost?

No cost, no obligation, and never more than three contractors.